Pre Excavation:-
- Checking column layout plan on an actual plot.
- Is all reference point is created?
Excavation:-
- Is the Hole for column and footing staked out correctly?
- Is the hole is sufficient for the steel reinforcement size?
- Is the depth of the hole is excavated up to Murum level?
Beam-column and footing:-
- Is the column standing vertically?
- Is the formwork and dimensions correct?
- Are all columns aligned as per Drawing?
- Is footing as per working drawing?
- Is footing correctly positioned and finish should not be smooth?
- Has the contractor checked all columns with reference points?
- Has the beam filled by concrete properly?
- Is vibrator being used for concrete to get a compressed and strong structure?
- check for concrete surface and repair if left exposed.
Murum filling, Piping, and Underground water tank:-
- Is Murum not too hard and not too soft?
- Is Murum Vibrated and compressed properly?
- Is the Murum level as per beam level?
- Is under Murum plumbing pipe properly placed?
- Do all drainage pipes have proper slopes?
- Do all drainage pipes are properly covered by concrete?
- Is the underground water tank is properly waterproofed?
Ground floor slab:-
- Is steel reinforcement properly placed?
- Is the top surface of Murum provided by thin polythene insulated or not?
- Is the thickness of Concrete accurate?
- Is top beam surface having Murum less surface or not?
- Is concrete is being used in the proper ratio?
- Is concrete cured properly?
Brickwork masonry:-
- Is brick been laid correctly and in proper alignment?
- check for brick cured with water before masonry work.
- Is there a satisfactory level of quality finish with no evidence of excessive mortar?
- Is joints thickness is up to the mark?
- Are the ventilation gaps free of excess mortar?
- check for Door and window size.
- Is the curing has done for a minimum of 7 days?
First-floor slab:-
- Is shuttering and support ok?
- check for joint and hole sealing with a tap.
- check for concrete ratio and thickness.
- Is concrete compressed by vibrator properly?
- Is steel reinforcement properly done as per engineer’s drawing?
- Is waterproof chemical being used in the correct ratio?
- Is steel provided by the Spacer between shuttering and steel bar?
- Is under concrete electric pipe and box properly placed as per drawing?
- Check for water salt.
Plastering and waterproofing:-
- Are the water and electric lines completed?
- Check for cleaning of masonry and RCC surface.
- Sand granule size should not be too small or too large.
- Check for the safety of Scaffoldings.
- Is the mortar mix in the correct ratio?
- Make sure of waterproofing agent if required in mortar mix.
- Check for a number of coats and thickness.
- Check for upward to downward plastering.
- Check for a sharp corner, straight edges and smooth finish.
- Check for removal of dead mortar and debris.
- Is the electric point is properly left while plastering?
- Check for curing for a specific time.
Plumbing and sanitary:-
- Before plaster, check all water line with water pressure if any leakage found.
- Install overhead water tank and check it filled fully.
- Is the height of plumbing fixtures as per drawing?
- Are the gas pipe and 4’ to 6’inch pipe is provided by anchor bolt to hold them properly?
- Has all work done as per approved drawing.
- Check all sanitaryware is properly working.
- Check lines of hot and cold water.
- Check for all traps if have any mortar filled into it.
- Check all drainage line is cleaned and draining properly.
Electric work:-
- Is the height of switch and socket as per drawing?
- Is plates are fitted straight and correctly?
- check for a gap between the wall and electric plates.
- Have the conduits been inserted into the box properly?
- Are all boxes on the same level height?
- Is provision of a boring motor, air conditioner, and heavy electric use is given?
- Check for TV and DTH cable provision.
- Make sure to put MCBs for every room and hall.
Colour and painting:-
- Is plastered wall rubbed by Cumi batti.
- Is the wall cleaned and free from dirt and dust before putty?
- Check for primer application.
- Check for putty quality and a number of coats.
- Punning if required.
- Check for uniformity in final putty.
- Check for colour code and uniform application of paint.
Door and window:-
- Check for Door frames are installed vertically straight.
- Check for the door is installed in proper alignment.
- Check for a gap between door and doorframe.
- Is the gap between window and wall filled with silicon?
- Are all accessories of the door and window properly fitted?
- Is polish work finishing looking good?
- Is overall finishing appropriate and satisfactory?